← All AI reports
2026-11-03 · reasoning over the OR field report of 2026-10-26 plus one web research lane

Why factories adopt machine learning faster than optimisation

Both fields say they struggle with awareness, data, expertise, trust and adoption. This page checks whether ML really got further than OR, why, what the OR world could copy from the ML ecosystem, and whether one company or only a crowd can pull that off.

0 · In short

The common impression is right on breadth, and the evidence is clear enough to act on. Every proxy that can be measured puts the ML ecosystem roughly an order of magnitude ahead of OR: employment, paper volume, open-source stars and downloads, course enrolments, platform users. Enterprise AI use is surveyed at 78 to 88 percent of organisations. OR adoption has no comparable breadth survey at all, and the fact that nobody measures it is itself part of the awareness problem.

Two things complicate it. First, the AI figures count "regular use in at least one function", a bar that a ChatGPT licence clears; McKinsey's own report has only about 39 percent seeing any profit impact. Second, OR is embedded and invisible: SAP IBP has shipped Gurobi since 2015, Kinaxis runs an optimiser, UPS and Amazon run OR at scale. Counted as "a solver runs somewhere in the stack", OR adoption is far higher than OR-branded adoption. So the honest statement is: ML is adopted far more widely and visibly, while OR is adopted deeply but narrowly, and in both cases the headline rate flatters the depth.

The five challenges share names, not mechanisms. That is the most useful finding here. ML's expertise problem was eased by a reusable artifact (a pretrained model, 3 million of them on Hugging Face); OR has no reusable artifact because each problem is a bespoke model. ML's trust problem is softer because a prediction can stay advisory; an optimisation output is a decision that displaces a person's plan, so trust has to be won by every planner, every day. ML's data problem tolerates approximately right data; OR needs complete and current data or the plan is infeasible. The field report already shows OR stalling exactly there: at data, daily use and ownership, never at the solver.

What to learn. The copyable parts of the ML playbook are the ecosystem mechanics: vendor-neutral open tooling with big-company money behind it, public benchmarks that face the user rather than the solver, managed cloud services, mass education, and a transferable artifact. The last one is the hard one, and the honest answer is that OR's transferable artifact is not a model but a productised vertical (rostering, routing, scheduling) with a configurable API, which is what Timefold, nextmv and the vertical APS vendors are each trying from a different angle. The LLM-to-formulation work (OptiMUS, Gurobi's assistant) is the first thing in years that attacks awareness and expertise directly, but so far its evidence is benchmarks and self-reports from existing users.

One company cannot do it. ML's spread was multi-actor by the record: two competing frameworks from two companies, then a six-member foundation; three hyperscalers; a competition platform; a model hub run by a startup; MOOCs; and academia supplying the benchmark. OR's single-company equivalents exist (Google OR-Tools, Gurobi's surveys and education) and remain small precisely because they are single-company. What is missing is the neutral layer: a foundation, a user-facing benchmark, a shared corpus of real formulations, and a cloud service a non-OR engineer can call. Which actors could plausibly form that is in section 6.

Verticals. The need for ML is horizontal: every function has something to predict, so the market is wide and shallow. The need for OR is vertical and deep: a few domains (logistics, scheduling, supply chain, energy, airlines, finance) carry most of the value, and in each the decision is operationally central. That shape explains both the depth of OR in UPS and the airlines and its absence in the SME mid-market, and it means an OR ecosystem will look like several vertical ecosystems sharing a thin common layer, not one horizontal platform.

Everything on this page is reasoning over two inputs: the OR field report of 2026-10-26 (which bundles the LLM x optimisation landscape of 2026-10-14 and the regional adoption report of 2026-10-16) and one web research lane run on 2026-11-03. Section 8 lists the source behind each number, and only figures whose source page was read are used. Paragraphs marked "Claude's opinion" are inference, not data.

1 · Did ML adapt better? What the numbers do and do not say

There is no survey that asks general enterprises "do you use mathematical optimisation". The only recurring OR survey, Gurobi's State of Mathematical Optimization, samples existing optimisation users, so it measures depth among adopters, not share of enterprises. Every comparison below is therefore a proxy, and the proxies all point the same way.

Breadth: the one number each side has

MeasureML / AIOR / optimisationReads as
Share of organisations using it88% "regular AI use in at least one business function" (McKinsey State of AI, Nov 2025, n=1,993); 78% (Stanford AI Index 2025, for 2024)No breadth survey exists. The only recurring survey (Gurobi) samples people who already use optimisationThe gap is real but the AI bar is low: only about 39% report any EBIT impact and about 6% are "high performers"
Depth among those who use itAbout one third scaling enterprise-wide (McKinsey)Among Gurobi's 2026 respondents (n=382, existing users): 45% run optimisation automatically in production, 90% combine it with MLAmong adopters, OR is at least as operationalised as AI. The problem is the size of the adopter set
Proxies in the field reportGerman logistics: 51% use some AI; GCC: 84% adopted AI somewhere, two thirds stuck in pilotsAbout 10% complete APS deployments vs >92% owning one (second-hand); 81% of S&OP in Excel; 2% APS in Poland (2016); 3 to 4% intelligent APS in ChinaSame pattern: AI "adopted" everywhere, OR present but not running

Ecosystem scale: every proxy, same direction

Proxy (retrieved 2026-11-03)MLORRatioCaveat
US employment 2025 (BLS)275,600 data scientists113,100 OR analysts2.4xMany optimisation people are titled data scientist or engineer; directional only
BLS projected growth 2025 to 203535%12%2.9x
arXiv listings 202546,101 cs.LG6,738 math.OC6.8xIncludes cross-lists. In 2015 the two were almost equal: 2,491 vs 2,246
GitHub stars, flagship framework105,103 PyTorch14,320 OR-Tools7.3xTensorFlow 201k, transformers 168k, scikit-learn 68k; HiGHS 1.9k, SCIP mirror 674
PyPI downloads, last month184.3M scikit-learn / 59.0M torch6.8M highspy / 6.2M ortools10x to 30xDownloads on both sides include automated and dependency installs, so they measure footprint, not users
Flagship MOOC enrolment856,232 ML Specialization (Ng); about 8M across his courses by 2023no published figure foundn/aCoursera Discrete Optimization exists; its enrolment page did not load
Reusable artifacts3,011,630 models on Hugging Face (Aug 2026)nonen/aNo OR equivalent exists; see section 4

The arXiv row is the one worth staring at. In 2015 machine learning and optimisation produced the same volume of papers. Ten years later one is seven times the other. The divergence is recent and it happened during exactly the decade when the ML ecosystem mechanisms in section 3 came online.

The counter-case: OR is adopted, just invisibly

  • Embedded in enterprise software. Gurobi has been "a key component of SAP's supply chain management solutions since 2015" and runs inside SAP IBP under a 10-year agreement signed 2020. Kinaxis Maestro runs an optimisation engine (23x solve-time improvement with NVIDIA cuOpt announced March 2026). A company that buys SAP IBP uses optimisation with no OR team and no awareness of it.
  • In-house at the giants. UPS ORION was projected to save 300 to 400 million dollars a year and 100 million miles (UPS projections, 2015 to 2016, not audited outcomes). Amazon runs OR teams in supply chain, inventory and routing and recruits "Applied Scientist, Operations Research" openly. INFORMS Edelman finalists claim over 400 billion dollars cumulative benefit since 1972 (self-reported, finalists only).
  • In the LLM landscape report. The 2026-10-14 landscape report found that on real routing data classical OR beat deep learning twice (Amazon Last Mile 2021, ORTEC EURO-meets-NeurIPS 2022), and that "the OR is in production, the LLM layer is in pilots" (section 4C, section 6).

So the fair statement is: ML is adopted widely and visibly, OR is adopted deeply and narrowly, and the invisible embedded layer means OR's true footprint is unmeasured. Neither headline number tells you about depth. The question that matters here is why the OR footprint stops at large firms and embedded suites and does not reach the mid-market, and that is a question about the five challenges.

2 · The five challenges side by side

The same five words appear in every adoption talk in both fields. Put the mechanisms next to each other and they stop looking like the same problem.

ChallengeHow it shows up in MLHow it shows up in ORWho has it harder, and why
AwarenessSolved by hype. "AI" is a board-level word; the buyer knows the category exists even when they cannot name a use case.The buyer cannot name the category. "¿Y eso qué es?" (SEIO 2024); "Operations Research is an anti-marketing term, unlike AI just not very exciting" (stage 1). The incumbent is a person's judgement, not a competing tool.OR, by a wide margin. ML's awareness problem became "too much awareness" (pilots that never scale); OR's is still "what is it".
DataNeeds volume and labels; tolerates noise, gaps and approximate truth. A model trained on 90%-correct data still predicts usefully.Needs completeness and currency. One wrong capacity or missing constraint makes the plan infeasible or wrong-but-confident. "The first stall, in every language"; data is relative, tacit or stale, not absent; data cleaning is 40 to 60% of an APS project (stage 3, 4.2).OR. Same word, different failure mode: ML degrades gracefully with bad data, OR fails sharply. And the data OR needs (the rules in the planner's head) is the kind no system records.
ExpertiseWas scarce, then was commoditised: pretrained models, AutoML, scikit-learn defaults, 8 million MOOC learners. A software engineer can ship a useful classifier without a PhD.Still scarce and still bespoke. "You have to translate the business problem into a mathematical model" (Hexaly CEO, 2025); modelling languages "worked for trained OR people and failed for everyone else" (4A); "once the problem is solved there is nothing to do" so in-house groups dissolve (stage 7).OR. The ML expertise problem was solved by making expertise reusable (an artifact); OR expertise is consumed per project and does not leave a reusable trace.
TrustA prediction can stay advisory. The human still decides, so a wrong prediction costs little and trust grows gradually. Explainability is a research topic, not a blocker, for most uses.The output is the decision. It displaces the planner's plan, so it is tested against that plan every day: parallel running, override for constraints only the planner knows, silent return to Excel ("the system is for the boss to look at") (stage 5). "A wrong formulation runs fine and returns a confident optimum to the wrong problem" (landscape, section 6). Opacity hands works councils and GDPR a lever.OR. Not because the maths is less trustworthy (it is more: there is a certificate) but because the artifact being trusted is a decision, and decisions have owners who are being replaced.
Adoption and integrationDeployment is a solved engineering pattern: MLOps pipelines, managed services (SageMaker 2017, Vertex 2021), model registries. "Machine learning has clear pipelines" (nextmv, 2026)."Decision systems have remained very bespoke and ad hoc" (same source). ERP/APS numbering mismatches, IT refusing to maintain, "driver adoption is the quiet killer", value credited to the wrong layer (stage 4, 4.7). Never adopted "without some consulting, a customised solution, and some integration work" (solver vendor founder).OR. The ML side industrialised its last mile; OR's last mile is still consulting. Chinese rule of thumb in the field report: 30% software, 70% implementation team.
Claude's opinion, not a dataset

Read down the right-hand column and one pattern repeats: in each case ML turned the challenge into something that could be solved once, centrally (a pretrained model, a pipeline template, a managed service, a hype cycle), and OR has to solve it again, locally, at every customer. That is not a maturity gap that time closes on its own. It follows from what the two fields produce: a prediction is a reusable function of data, a decision is a bespoke function of one organisation's constraints. Section 4 takes this apart.

3 · What made ML spread, and the OR equivalent of each piece

Each row is one mechanism with a verifiable origin on the ML side. The OR column asks whether the same thing exists and at what scale.

MechanismML version (verified)OR versionGap
Public benchmark that faces the userImageNet / ILSVRC, annual 2010 onward, 50+ institutions competing on a task anyone can understand (is this a cat). Kaggle: 29M users, 68 competitions in 2025, 3.67M dollars in prizes.MIPLIB 2017 (1,065 instances, 240 for benchmarking), DIMACS challenges (12th on vehicle routing 2020 to 2022), MiniZinc Challenge. All solver-facing: they rank solvers for OR people, they do not show a logistics manager what optimisation does to their problem.The OR benchmarks are good science and bad marketing. There is nothing a non-expert can enter, watch or understand. The landscape report adds that 26 to 54% of items in the new LLM-for-OR benchmarks are flawed, so even the research-facing layer is shaky.
Vendor-neutral open framework with big-company moneyTensorFlow open-sourced 2015 by Google; PyTorch by Meta 2016, moved to the Linux Foundation 2022 with AMD, AWS, Google Cloud, Meta, Microsoft, NVIDIA as founding members; 2,400+ contributors, 18,000 organisations.Google OR-Tools (Apache 2.0, since 2010, one company, 14k stars). HiGHS and SCIP are academic (Edinburgh, ZIB). No multi-vendor foundation; the commercial leaders (Gurobi, FICO, Hexaly, COPT) are closed and compete on the solver itself.ML's framework layer was deliberately neutralised so that no one vendor owned the on-ramp. OR's on-ramp is either one company's project or an academic one with no commercial backing. The solver, the field report says, is the commodity layer, yet it is the only layer the industry has organised around.
Managed cloud serviceSageMaker (Nov 2017, "build, train and deploy at any scale"), Vertex AI (May 2021, pitched at "very few models making it into production"), Azure ML.Gurobi Instant Cloud, nextmv's platform, cuOpt as an NVIDIA service. No hyperscaler offers "optimisation as a managed service" the way all three offer ML.A software engineer at a mid-size firm can call a managed ML endpoint today. There is no equivalent call for "solve my rostering problem" that does not begin with a sales conversation.
Mass educationAndrew Ng's courses: about 8M learners by 2023; ML Specialization 856k enrolled. Fast.ai, every university's intro course.Discrete Optimization on Coursera (Van Hentenryck and Coffrin). Gurobi and INFORMS run education programmes.No OR course publishes enrolment at anything like this scale, and an OR course is harder to start because it assumes the learner already has a formulated problem.
Transferable artifactPretrained models: 1M on Hugging Face Sept 2024, 2M Aug 2025, 3M Aug 2026. Fine-tune or call, do not build.None. A routing model for one depot does not transfer to another firm's depot without re-modelling. Nearest things: productised vertical APIs (Timefold "has productised the domain into standardised, configurable APIs"), and vertical APS/routing products.This is the mechanism with no OR analogue and it is upstream of the expertise, trust and integration gaps. Section 5 argues the productised vertical is the OR artifact.
Hype and capitalUS private AI investment 109.1bn dollars in 2024 (Stanford). Gartner: about 1.5 trillion dollars AI spend in 2025 (includes hardware and consumer devices, not comparable to software).Venture rounds in the tens of millions: Timefold Series A 13M dollars (2026), nextmv Series A 8M (2021). "Prescriptive analytics market size" figures exist only from market-report firms with inconsistent definitions, so none is used here.Three to four orders of magnitude in capital. Hype solved ML's awareness problem for free; OR has to pay for awareness one sales call at a time.

4 · Why the challenges are not symmetric: prediction vs decision

Claude's opinion, not a dataset

Four structural differences explain most of the table in section 2. None of them is about maturity, so none of them goes away with time alone.

  1. Prediction is advisory, decision is imperative. A forecast sits next to the human and the human decides; being 80 percent right is useful and safe. An optimised plan replaces the human's plan. The planner either runs it or overrides it, and the regional report documents all three failure modes (parallel running, override, silent Excel). The robots piece in the field report makes the same point from the other end: optimisation only becomes "a precondition of running at all" when no human stands between the plan and the world. Until then, trust has to be earned per planner, per shift.
  2. A prediction is a reusable function, a decision is a bespoke one. Two companies' demand forecasting problems are similar enough that the same model architecture, often the same pretrained weights, serve both. Two companies' rostering problems share the solver and the vocabulary but not the constraints, and the constraints are the product. This is why ML got a model hub and OR got a consulting industry.
  3. ML degrades, OR breaks. Noise in training data lowers accuracy a little. A missing constraint or a stale capacity makes the optimum confidently wrong. So "we have data" means different things: ML can start with what is in the warehouse, OR has to extract what is in the planner's head first. The field report's finding that data is "relative, tacit or stale, not absent" is exactly this.
  4. Value is horizontal for ML, vertical for OR. Every function predicts something (churn, demand, fraud, text), so ML is a horizontal market and horizontal markets get platforms. Combinatorial decisions with real money attached live in a handful of verticals, so OR gets vertical products and in-house teams at the firms big enough to afford them. Section 7 lays this out.

One consequence worth saying plainly: OR's awareness and expertise problems are partly downstream of the other three. If the artifact were reusable, awareness would spread with it (people learned what ML was by using products that contained it) and expertise would be needed once per vertical rather than once per customer. That is why the "what to learn" list in the next section is mostly about the artifact and the neutral layer, not about marketing.

5 · What OR can learn, and what does not transfer

Claude's opinion, not a dataset

Taking the mechanisms of section 3 one by one.

From MLTransfers?What it would look like in OR
A transferable artifactNot as a model. Yes as a productised vertical.The OR "pretrained model" is a vertical product with the common 90% of constraints built in and a configurable API for the rest: rostering, vehicle routing, production scheduling, cutting. Timefold, nextmv and the vertical APS vendors are each attempting this. The regional report's 250-euro cutting tool that "pays back on one order" is the existence proof that it works when the problem is narrow enough.
Vendor-neutral open layer with commercial backingYes, but not at the solver.The solver is the commodity; neutralising it (HiGHS is already there) changes little. The layer worth neutralising is the one above: a shared, open modelling and data-contract layer for the common verticals (what a shift, a vehicle, an order, a capacity look like), so that products and consultancies compete on the last 10% instead of rebuilding the first 90%. Nobody owns this today. The field report notes an independent vendor in a robotised world survives "via an open control standard or by owning the business-rules layer"; the same two options apply here.
User-facing benchmarksYes.Public, realistic, anonymised instances per vertical with a baseline that is "the planner's Excel plan", so the metric a buyer sees is "percent better than what you do now", not "seconds to optimality". The ORTEC EURO-meets-NeurIPS challenge was a step in this direction and is the kind of thing a neutral body should run every year.
Managed serviceYes, for the productised verticals.An endpoint a software engineer can call for a rostering or routing problem, priced per solve, with the data contract above. Not "solver in the cloud" (exists, serves OR people) but "decision in the cloud" (does not exist, would serve everyone else).
Mass educationPartly.Not more Discrete Optimization MOOCs. Education aimed at the buyer and the planner: what an optimisation project needs from you, how to read a plan, what an override costs. The field report found skills and time ranked above money as the blocker almost everywhere (Germany 73% know-how vs 48% money), so the education gap is on the customer side, not the OR side.
HypeBorrowable, not reproducible.OR cannot generate a hype cycle. It can ride one: "decision intelligence" (Gartner's word) and "AI agents that act" are the current vehicles. The landscape report's finding that every production system "kept a classical engine and its certificate" is the sales argument: the LLM is the interface, the solver is what makes the action safe.
LLM as the formulation bridgePromising, unproven in the field.OptiMUS, Chain-of-Experts and Gurobi's AI Modeling attack awareness and expertise directly by letting a non-expert describe the problem. The evidence so far is benchmarks (with 26 to 54% flawed items) and Gurobi's survey of existing users (79% now use LLMs in their optimisation work, 2026). The landscape report's conclusion stands: "no source shows a non-expert business user getting a production model from natural language at a paying customer with a measured outcome". Verification, not generation, is the bottleneck.

6 · One company, open source, or many stakeholders

Claude's opinion, not a dataset

The ML record says: not one company. Academia supplied the benchmark (ImageNet, Princeton and Stanford). Two companies open-sourced competing frameworks and the winner was then handed to a six-member foundation so no vendor owned the on-ramp. Three hyperscalers built managed services. A startup built the model hub. MOOCs came from a professor. No actor controlled the whole chain and the parts reinforced one another: the benchmark created the talent, the framework made the talent portable, the cloud made the talent deployable, the hub made the output reusable.

OR's single-company attempts show the limit. OR-Tools is excellent and has 14k stars after fifteen years, because it is one company's project with no foundation, no benchmark competition and no managed service around it. Gurobi runs the only recurring survey and a good education programme, and it samples its own users. Each vertical startup (Timefold, nextmv, Hexaly, the 35 German routing vendors at 5 to 20k euro) is productising alone and competing on the first 90% as well as the last 10%.

Can one company still do it? One company can own a vertical. Timefold can plausibly become "the rostering artifact", the way one vendor became the standard tool in cutting and packing. One company cannot build the horizontal layer, because the horizontal layer only has value if competitors adopt it, and competitors do not adopt a rival's standard. That is precisely why PyTorch had to leave Meta.

Can open source alone do it? Not by itself. HiGHS and SCIP are open and good and sit at 1.9k and 0.7k stars. The ML frameworks spread not because they were open but because they were open and funded by companies with a commercial reason to want the ecosystem (Google wanted cloud customers, Meta wanted researchers). Open source is a necessary piece, not the engine.

So who are the stakeholders, realistically?

  • A hyperscaler or NVIDIA with a reason to want optimisation workloads. NVIDIA is the obvious candidate: cuOpt is Apache 2.0, the Kinaxis deal shows the commercial route, and the landscape report already calls the solver-acceleration bucket "a hardware story and NVIDIA is winning it". A GPU vendor wants every planning problem to run on a GPU and does not care which solver or product wins; that is the same incentive Google had with TensorFlow.
  • The embedded suites (SAP, Kinaxis, Blue Yonder, o9), who already ship solvers invisibly and would gain from a shared data contract that lowers their own integration cost.
  • Vertical product companies (Timefold, nextmv, Hexaly, routing vendors) who supply the artifacts and would gain a neutral benchmark to prove themselves against incumbents' Excel.
  • Academia and INFORMS / EURO to run the user-facing benchmark and own the instance corpus, as ZIB does for MIPLIB today, but with a planner's baseline instead of a solver's.
  • A public pull where it exists: the regional report found regulation (NHS rostering mandate, CO2 in tenders, co-determination) and labour shortage are the only pulls that moved buyers, and that Europe's regulatory pull "keeps OR explicit and ownable". A European open decision layer for rail, grids and hospitals is the sovereignty argument the landscape report already made for solvers, moved up one layer.

What this is not: it is not a plea for an "INFORMS for industry". The ML foundation came after the frameworks had already won, to protect them. The OR sequence would need to be: one or two productised verticals win real mid-market share first, then the shared layer is extracted from them and handed to a neutral body with hyperscaler money. Which means the first move is still a company, and the test of whether it is the right company is whether it would give the layer away afterwards.

flowchart LR
  subgraph ML["ML ecosystem, as it happened"]
    a1[Academia: benchmark
ImageNet 2010] --> a2[Big tech: open frameworks
TF 2015, PyTorch 2016] a2 --> a3[Foundation: neutral on-ramp
Linux Foundation 2022] a2 --> a4[Hyperscalers: managed service
SageMaker 2017, Vertex 2021] a4 --> a5[Startup: model hub
Hugging Face, 3M models] a1 --> a6[MOOCs: millions of learners] end subgraph OR["OR today"] b1[Academia: solver benchmark
MIPLIB, DIMACS] --> b2[One company: OR-Tools
14k stars, no foundation] b3[Closed solvers compete
Gurobi, FICO, Hexaly, COPT] b4[Vertical startups productise alone
Timefold, nextmv, routing vendors] b5[Suites embed invisibly
SAP, Kinaxis, Blue Yonder] b6[No managed decision service
No shared data contract
No user-facing benchmark] end

7 · Need for ML vs need for OR by vertical

Claude's opinion, not a dataset

The general need for ML is horizontal: anything with history can be predicted, so every department has a use case and the market is wide and shallow. The general need for OR is for a combinatorial decision with money on it, which is concentrated. The table marks how central each kind of need is to running the business in each vertical, drawing on the readiness ranking in the regional report (section 7, section 8). "Central" means the business cannot run without someone doing it daily; "useful" means it improves a function; "marginal" means it is nice to have.

VerticalNeed for prediction (ML)Need for decision (OR)Where OR actually stands (from the field report)
Airlines, railUseful: demand, delay, maintenanceCentral: crew, fleet, timetable, pricing, recoveryMature, in-house, the OR heartland. Readiness rank 1.
Parcel and platform logisticsUseful: ETA, demand, dynamic part of routing (where ML beat OR at ORTEC 2022)Central: routing, dispatch, network designMature at UPS, Meituan, Cainiao, Amazon; in-house, "not a market". Stalls at small operators.
Road freight SMEs, dispatchUseful: ETA, demandCentral but done by a dispatcher in their head35 German vendors at 5 to 20k euro; 53% of firms lack dispatchers; "driver adoption is the quiet killer". Rank 3, pulled by labour shortage.
Manufacturing schedulingUseful: demand, quality, predictive maintenanceCentral at the plant level; master data is the stallHead firms mature, SMEs stall at master data; >92% own APS, about 10% complete. 30% software, 70% implementation.
Supply chain planning, S&OPCentral: demand forecasting is the core inputCentral: inventory, allocation, networkEmbedded in SAP IBP, Kinaxis, o9; 81% of S&OP still in Excel. This is where ML and OR need each other most, and where OR is most invisible.
Energy, gridsUseful: load and renewables forecastingCentral: unit commitment, dispatch, network expansionMature at incumbents (EDF, Chinese grid solver across five provinces); sovereignty argument in Europe. Rank 1.
Healthcare rostering, hospital logisticsUseful: admissions, length of stayCentral: rostering, OR scheduling, beds"Clearest problem, weakest use": ready to buy, not to use; no people in house. Rank 4, pulled by regulation (NHS mandate).
FinanceCentral: risk, fraud, credit, pricingUseful to central: portfolio optimisation, ALM, tradingMature, in-house, mostly invisible as "quant" rather than OR.
Retail and e-commerceCentral: demand, recommendation, pricingUseful: assortment, replenishment, markdown, fulfilmentEmbedded in Relex, Blue Yonder; large firms in-house.
Marketing, sales, HR, customer serviceCentral to useful: churn, scoring, text, LLM assistantsMarginal: some scheduling and budget allocationEffectively no OR. This is where the ML breadth number comes from.
Mining, agriculture, constructionUseful: yield, failure, gradeCentral: fleet dispatch (Komatsu/Modular DISPATCH since 1996), blending, schedulingMature in mining at the equipment vendor; the robots piece's precedent for "the optimisation layer follows the control interface".

Three things fall out of the table. First, the ML breadth number is largely the bottom rows: functions every company has and where OR has nothing to say. Second, in the rows where OR is central, it is already adopted, in-house or embedded, at firms large enough to afford a team; the unserved market is the same rows one size down, which is exactly the mid-market the regional report found stuck in Excel. Third, the one row where the two needs are both central, supply chain planning, is where OR is most invisible and most dependent on ML's forecast as input; the landscape report's "ML predicts the uncertain part, the engine still does the combinatorics" is the architecture of that row.

So an OR ecosystem would not be one horizontal platform like the ML stack. It would be four or five vertical ecosystems (routing, rostering, production scheduling, supply chain planning, energy) sharing a thin common layer: data contracts, a solver, a benchmark method and an LLM front end. That is a smaller, more fragmented thing than the ML ecosystem, and it is also why it has not self-assembled.

8 · What was verified, what was not, sources

Web retrieval happened on 2026-11-03. Only figures whose source page was read appear on this page. Figures from the earlier reports are cited to the section of the report they live in and carry that report's own caveats (second-hand, vendor-commissioned, Claude's inference).

Sources read

  • McKinsey State of AI 2025 figures (88%, 78% prior year, about 39% EBIT impact, about 6% high performers, n=1,993), as quoted from the report by a secondary summary at siliconcanals.com; mckinsey.com itself did not load.
  • Stanford AI Index 2025: 78% of organisations using AI in 2024; 109.1bn dollars US private AI investment. hai.stanford.edu.
  • Gartner AI spending about 1.5 trillion dollars 2025: HPCwire copy of the 2025-09-17 release (gartner.com returned 403).
  • Gurobi 2025 State of Mathematical Optimization (released 2025-09-23): 81% combine ML, 6% use GenAI, 24% experimenting. gurobi.com newsroom.
  • Gurobi 2026 report (released 2026-10-28, n=382): 79% use GenAI/LLMs, 90% combine ML, 45% automatic production. Business Wire copy at sttinfo.fi. The release says 79% is up from 30% in 2025, which does not match the 6% in the 2025 release; the question wording evidently differs.
  • BLS Occupational Outlook: OR analysts 113,100 jobs 2025, 12% growth; data scientists 275,600, 35% growth. bls.gov.
  • arXiv listing totals for cs.LG and math.OC, 2015, 2020, 2025, from arxiv.org/list pages; cross-lists included.
  • GitHub star counts via the GitHub API; PyPI monthly downloads via pypistats.org.
  • Kaggle 29M+ users (mlcontests.com, State of ML Competitions 2025) and 23.29M accounts April 2025 (Wikipedia).
  • Coursera ML Specialization 856,232 enrolled (coursera.org); about 8M learners by 2023 (Wikipedia, Andrew Ng).
  • Hugging Face 1M / 2M / 3,011,630 models (huggingface.co blog, Aug 2026).
  • ILSVRC description (Russakovsky et al., arXiv 1409.0575); MIPLIB 2017 instance counts (ZIB); DIMACS challenge list; MiniZinc Challenge 2024 results.
  • TensorFlow open-sourcing post (research.google, 2015); PyTorch to Linux Foundation (linuxfoundation.org, 2022); SageMaker launch (aws.amazon.com, 2017); Vertex AI launch (Google Cloud press, 2021); OR-Tools history (Wikipedia).
  • Hexaly CEO interview (nextmv blog, 2025-06-03); Kompas VC on Timefold Series A 13M dollars (2026-07-31); nextmv DecisionOps post (2026-02-26) and Series A 8M dollars (2021-02-09).
  • Ranyard, Fildes and Hu, EJOR 2015 abstract (ideas.repec.org); Laura Albert on analytics vs OR (punkrockor.com, 2014).
  • UPS ORION: Transport Topics 2016-08-09 (300 to 400M dollars, 100M miles) and DC Velocity 2015-03-01; these are UPS projections, not audited outcomes.
  • Amazon Science on OR postdocs in SCOT (2023-08-29); Gurobi in SAP since 2015 and the 2020 ten-year agreement (helpnetsecurity.com, Gurobi 2016 release); Kinaxis and NVIDIA cuOpt 23x (investors.kinaxis.com, 2026-03-16).
  • INFORMS Edelman 400bn dollars cumulative (The OR Society eNews, Feb 2024); OptiMUS (arXiv 2310.06116); Chain-of-Experts (ICLR 2024 proceedings).

Looked for and did not find

  • Any survey of general enterprises giving the share that use mathematical optimisation. This is the number the whole question turns on and it does not seem to exist.
  • INFORMS membership and an OR MOOC enrolment figure (informs.org and the Coursera course page did not load).
  • Degrees granted in OR vs ML, job-posting counts, Stack Overflow activity, a trustworthy optimisation-software market size, Gurobi revenue, Hexaly funding, an audited ORION outcome.
  • A venture-funded "natural language to optimisation model" startup; the search surfaced academic frameworks and Gurobi's own tooling only.

Earlier reports used

0 · In short

Margin sits where a layer owns a standard, a control interface or a record, not where the intelligence is. ERP, control software, data platforms and simulation earn high and stable margins. The two layers that hold the actual decision intelligence, prediction and the solver, are the most commoditised. Consulting is the largest pool of OR work and earns labour margins.

FICO is the clearest single number on this tab. The same company, selling to the same banks, earns about 88% segment margin on a score that became an industry standard and about 30% on decision software. The value is not in the algorithm. It is in becoming the thing a process cannot run without.

The OR that has already won is the invisible kind. Advanced process control in cement and chemicals is optimisation running inside the control system. It is sold by the control vendor, measured on the energy bill, and nobody calls it OR. Embedded solvers in SAP and Kinaxis are the same pattern one layer up.

Verticals differ mainly in what the money is made of. In cement it is energy and carbon. In precision manufacturing it is yield and throughput, the largest money per site. In food it is raw material, waste and changeovers. In road it is labour and fuel, against margins so thin that 1% fewer miles is the same order as the whole profit.

Dimensions worth adding to yours: who owns the control interface, who gets credit for the saving, who carries the blame when a decision is wrong, how fast a decision must be taken, and whether the user is the buyer. Section 5 has these with reasons.

Numbers on this tab come from company filings, official releases and the sources in section 7, and only figures whose source page was read are used. Vendor claims are marked as vendor claims. Everything else in the layer cards (who buys, how standardisable, how much leverage) is Claude's reading from the two research lanes, the earlier reports and general industry knowledge, not a survey.

1 · The map: eleven layers from sensor to planner

Data flows up the stack and decisions flow down. Read it bottom to top. The highlighted rows are the layers usually called OR (blue edge) and ML (amber edge). The columns are a scan; each cell links to the full card.

Layer, top to bottomSeller marginsCommoditised?Usually delivered asMostly made of
11 · The human plannernone, a cost linescarcein-house labourhuman
10 · Integration and consulting13 to 15% operatinglabour-pricedconsultinghuman
9 · Simulation and digital twin84 to 89% grosslowproduct plus modellerssoftware plus expert
8 · Advanced process control and real-time optimisationabout 33% unit EBITAlowproduct plus vendor engineerssoftware plus engineers
7 · Planning and scheduling applications15 to 29% operatinglow to mediumproduct plus heavy implementationsoftware plus consultants
6 · Optimisation engine (solver)not disclosed; FICO software 30%risingproduct, mostly embeddedsoftware
5 · Prediction and analytics (BI and ML)losses commonhighin-house or platformsoftware plus data scientists
4 · Data platform and historian67 to 82% grossstorage yes, semantics noproduct plus data teamsoftware plus cloud
3 · System of record (ERP)27 to 31% operatinglowproduct plus integratorssoftware plus integrators
2 · Control and execution15 to 33% segmentlowproduct plus implementationsoftware, hardware, engineers
1 · Sensing and instrumentation3 to 51% operatingvariesproducthardware

Margin bands summarise the companies in each card: operating margin unless marked gross. Simulation and ERP are high because they are standards inside workflows. Prediction tools lose money because the method is free and the value is booked elsewhere.

2 · Layer by layer, abstract and concrete

Click a layer to open it. Each card gives the layer in one abstract sentence, then a concrete example, then the same sixteen dimensions in the same order. Open all · Close all

1 Sensing and instrumentationTurns the physical world into numbers. Every layer above it is blind without it.

Abstract. Turns the physical world into numbers. Every layer above it is blind without it.

Concrete. Gas analysers and an X-ray analyser on raw meal in a cement plant. Metrology tools and cameras in a fab. Checkweighers, metal detectors and temperature loggers on a food line. A telematics box in every truck.

Value it creates
Visibility, and the back-channel that tells a plan what actually happened. The regional report found this missing almost everywhere: in DACH only 44% capture machine feedback (matrix 2).
What it predicts or decides
Mostly nothing. Machine vision is the exception: it rejects a part, which is the first automated decision in the stack.
Data it needs collected
Raw signals: temperature, pressure, flow, composition, images, position, weight.
How often it acts
Continuous.
Usual tech stack and vendors
Field instruments and analysers (Endress+Hauser, SICK), vision (Cognex, Keyence), fieldbus and OPC UA gateways, telematics (Samsara and others).
Who in the company it talks to
Plant engineering, maintenance, quality. For telematics, the fleet or transport manager.
Knowledge needed: tech vs vertical
Physics of the process and of the instrument. Very vertical: an analyser for clinker is not one for milk.
How it is delivered: in-house, human labour, consulting, product
Product, installed by the vendor's service teams or an integrator.
How standardisable
High for the device and the interface. Low for where to put it and what to measure.
How commoditised
Basic sensors are commodities. Analysers, vision and certified instruments are not.
Profit margins of the sellers
The widest spread in the stack. Keyence 51.0% operating margin, SICK 3.0% EBIT, Endress+Hauser 11.9%, Cognex 16.3% on 66.9% gross. Samsara, sold as subscription, 77% gross and -3% operating.
Edge and pricing leverage
Depends on the business model, not the layer: a catalogue product sold direct (Keyence) earns software-like margins, an engineering-heavy one does not.
Switching cost
Medium. An instrument lives as long as the line it sits on.
Money it moves
Enabler. Its value is counted in the layers above, and its absence is where OR projects stall first.
Software vs hardware vs human expert
Mostly hardware plus installation labour. Telematics shows the move to subscription software.
Cement vs precision vs food vs road
Cement: few expensive analysers in a harsh environment, and lab results arrive hours late. Precision: extreme density, fabs now sample every tens of milliseconds and collect hundreds of petabytes a year. Food: many cheap washdown-rated sensors, much still recorded on paper. Road: a telematics box per vehicle, and drivers who do not switch on the app.
2 Control and executionCarries out the plan: tells machines, workers and trucks what to do now, and records that it was done.

Abstract. Carries out the plan: tells machines, workers and trucks what to do now, and records that it was done.

Concrete. The DCS that runs a cement kiln. The MES that tracks each lot through a precision plant. The WMS that picks the pallet with the earliest expiry date in a food warehouse. The TMS that dispatches loads.

Value it creates
Execution and traceability. It is the control interface, and the robots piece in the field report argues that the optimisation layer ends up owned by whoever owns this layer (field report, tab 3).
What it predicts or decides
Low-level control loops and sequences. WMS slotting and pick order. A TMS often embeds simple routing.
Data it needs collected
Setpoints and states, lot genealogy, order status, proof of delivery.
How often it acts
Milliseconds (control loops) to minutes (dispatch).
Usual tech stack and vendors
DCS and PLC from Siemens, Rockwell, ABB, Emerson, Honeywell, Yokogawa. MES. WMS from Manhattan, Blue Yonder, SAP. TMS from Descartes, Oracle, SAP.
Who in the company it talks to
Plant manager, automation engineer, operations or logistics director, with IT.
Knowledge needed: tech vs vertical
Strongly vertical and safety-critical. Controls engineering for the plant side, warehouse and transport process for the logistics side.
How it is delivered: in-house, human labour, consulting, product
Product with heavy implementation. At Manhattan, services are 46.5% of revenue.
How standardisable
The product is standard. Configuration is per site.
How commoditised
Low for DCS and MES. WMS and TMS are more competitive.
Profit margins of the sellers
Inside the automation majors this is where margin sits. Rockwell Software and Control 29.7% segment margin vs 18.0% devices and 14.5% lifecycle services. Emerson Control Systems and Software 33.0% adjusted EBITA. Siemens Digital Industries 14.9%. Manhattan 25.9% GAAP operating, Descartes 28.8% on 77% gross.
Edge and pricing leverage
High. It owns the switch. Replacing a DCS means stopping the plant.
Switching cost
Very high.
Money it moves
Hard to isolate, because it is the precondition for everything above.
Software vs hardware vs human expert
Software and controller hardware, plus engineering labour.
Cement vs precision vs food vs road
Cement: a DCS with cement-specific libraries from a handful of vendors. Precision: the MES record is part of the regulated quality record. Food: traceability is law; the US FSMA 204 rule requires records of 7 critical tracking events, handed to FDA within 24 hours, enforced from 2028-07-20. Road: the TMS and the driver app.
3 System of record (ERP)The official truth about orders, materials, stock, money and master data.

Abstract. The official truth about orders, materials, stock, money and master data.

Concrete. SAP S/4HANA at a cement group. The bills of material and routings a production scheduler needs, which the regional report found missing "8 years after ERP" in a German plant.

Value it creates
One record that everyone plans from. It is the main input to planning and the main source of the data problem.
What it predicts or decides
Rule-based MRP, not optimisation. Optimisers are embedded in its planning modules: Gurobi has been inside SAP supply chain products since 2015.
Data it needs collected
Orders, bills of material, routings, prices, stock, customer and supplier master data.
How often it acts
Transactional; planning runs nightly.
Usual tech stack and vendors
SAP, Oracle, Microsoft Dynamics, Infor, and regional players.
Who in the company it talks to
CFO and CIO.
Knowledge needed: tech vs vertical
Business process and accounting. Moderately vertical.
How it is delivered: in-house, human labour, consulting, product
Product, implemented by system integrators.
How standardisable
High at the core, custom at the edges.
How commoditised
Low.
Profit margins of the sellers
SAP 73.2% gross, 26.7% operating, services only 11.6% of revenue. Oracle 31% operating.
Edge and pricing leverage
Very high. SAP is moving licences to cloud with no loss of gross margin (cloud gross margin 74.2%), which is what lock-in looks like.
Switching cost
Very high.
Money it moves
Indirect. Bad master data here is what makes optimisation above it fail.
Software vs hardware vs human expert
Software plus a large integrator workforce.
Cement vs precision vs food vs road
Cement: few products, co-products and recipes. Precision: configurations and serial numbers. Food: batches, expiry dates, variable weights. Road: orders and addresses, often the weakest master data of all.
4 Data platform and historianCollects and joins data across systems so it can be analysed or fed into a model.

Abstract. Collects and joins data across systems so it can be analysed or fed into a model.

Concrete. A process historian storing every kiln tag for ten years. A cloud lake joining ERP orders, telematics and weather.

Value it creates
Integration. The regional report calls data "the first stall, in every language"; this layer is where that stall is fought (stage 3).
What it predicts or decides
Nothing.
Data it needs collected
Everything below it, as time series joined to master data.
How often it acts
Continuous ingestion; batch joins.
Usual tech stack and vendors
AVEVA PI and other historians on the plant side. Snowflake, Databricks, the hyperscaler clouds, Palantir Foundry, ETL tools on the IT side.
Who in the company it talks to
CIO, chief data officer, data team. The historian is bought by plant engineering.
Knowledge needed: tech vs vertical
Mostly technical. Vertical knowledge is needed for the meaning of the data, which is the hard part.
How it is delivered: in-house, human labour, consulting, product
Product, run by an internal data team, often set up by an integrator.
How standardisable
Technically high. The semantics (what this tag or field means) are not.
How commoditised
Storage and compute are commodities. A contextualised plant data model is not.
Profit margins of the sellers
Snowflake 67% gross, -31% GAAP operating. Palantir 82.4% gross, 31.6% operating. AVEVA 81.2% gross, 29.5% adjusted EBIT (last public year, to March 2022).
Edge and pricing leverage
High through consumption: net revenue retention 125% at Snowflake and above 140% at Databricks, so customers keep spending more.
Switching cost
High.
Money it moves
Indirect, and the spend grows with use.
Software vs hardware vs human expert
Software and cloud compute plus data engineers.
Cement vs precision vs food vs road
Cement and process: a long historian culture, data exists but lab data lags. Precision: volume is the problem. Food: much of the floor is paper and spreadsheets. Road: telematics data exists, but service times and real addresses are not recorded.
5 Prediction and analytics (BI and ML)Says what is happening or what will happen: dashboards, forecasts, quality estimates, failure warnings.

Abstract. Says what is happening or what will happen: dashboards, forecasts, quality estimates, failure warnings.

Concrete. A soft sensor that estimates free lime in clinker before the lab result arrives. A demand forecast for fresh dairy. Yield prediction and defect classification in a fab. A delivery-time estimate.

Value it creates
Less uncertainty. It is advisory: the human still decides, which is why it is easier to adopt (tab 1, section 4).
What it predicts or decides
Predicts. On its own it decides nothing; it supplies inputs to a decision.
Data it needs collected
History with outcomes: lab results, failures, sales, defects, arrival times.
How often it acts
Daily forecasts to real-time estimates.
Usual tech stack and vendors
Power BI, Tableau; Python with scikit-learn, XGBoost, PyTorch; SageMaker, Vertex AI, Azure ML, Databricks; vertical vendors for process plants.
Who in the company it talks to
Data science or BI team, and function heads: demand planning, quality, maintenance.
Knowledge needed: tech vs vertical
The technical skill is widely available (tab 1). Vertical knowledge decides which prediction is worth making.
How it is delivered: in-house, human labour, consulting, product
Mostly in-house or as a feature of a platform. Consulting for setup.
How standardisable
The method is highly standard. Features and data cleaning are per site.
How commoditised
High: open-source libraries and pretrained models.
Profit margins of the sellers
Horizontal tools struggle to keep the value. C3.ai 31% gross with an operating loss about twice its revenue. Alteryx 86.5% gross, -17.0% operating in its last public year.
Edge and pricing leverage
Low as a horizontal tool. Higher when it is sold together with the decision it feeds, for example closed-loop kiln control priced on fuel saved.
Switching cost
Low.
Money it moves
Only as much as the decision it feeds. One process-AI vendor (Imubit) says lab free-lime results describe the kiln 30 minutes to hours late, and that closing the loop cut process variability by 20 to 30% (vendor claim).
Software vs hardware vs human expert
Software and data scientists.
Cement vs precision vs food vs road
Cement: soft sensors where the lab is slow. Precision: the biggest single number on this page; an Entegris executive put 1% of yield at about $500m a year of profit at an advanced logic fab, $150m at a memory fab. Food: forecasting against waste, which is 3.8% of food handled in UK manufacturing (WRAP). Road: arrival-time and service-time prediction.
6 Optimisation engine (solver)Given a model of the choices and constraints, finds the best feasible combination and proves how far from optimal it might be.

Abstract. Given a model of the choices and constraints, finds the best feasible combination and proves how far from optimal it might be.

Concrete. Gurobi inside SAP planning. OR-Tools inside a routing startup. A MIP solver inside a fab scheduler. cuOpt running vehicle routing on a GPU.

Value it creates
The mathematical engine, with a certificate. The field report's central finding is that this is never where projects fail: it is the commodity layer.
What it predicts or decides
Computes the decision another layer asked for.
Data it needs collected
None of its own: a model and its parameters.
How often it acts
Per solve, seconds to hours.
Usual tech stack and vendors
Commercial: Gurobi, FICO Xpress, IBM CPLEX, Hexaly, COPT. Open: OR-Tools, HiGHS, SCIP, cuOpt. Modelling: Pyomo, JuMP, AMPL, GAMS.
Who in the company it talks to
OR teams and software vendors that embed it. Almost never the business.
Knowledge needed: tech vs vertical
Deep mathematics. No vertical knowledge.
How it is delivered: in-house, human labour, consulting, product
Product (licence), most often sold to another software company to embed.
How standardisable
Fully standard.
How commoditised
Rising: HiGHS is open, and NVIDIA publishes cuOpt under Apache 2.0.
Profit margins of the sellers
No one discloses pure solver revenue. Gurobi is private and reports over 1,200 customers through its owner. FICO is the useful contrast: its Scores segment earns 87.8% segment margin, its Software segment 30.1%, selling to the same banks.
Edge and pricing leverage
High for performance-critical users, falling for basic solving. The FICO split says the money is in becoming a standard inside a process, not in the algorithm.
Switching cost
Medium: models written against one vendor's interface.
Money it moves
The smallest pool relative to the value it enables, because the value is booked in the layers above.
Software vs hardware vs human expert
Pure software. Increasingly GPU compute.
Cement vs precision vs food vs road
Same engine everywhere, different problem classes: blending and recipes (linear programmes) in cement and food, scheduling (mixed integer and constraint programming) in precision and food, vehicle routing in road.
7 Planning and scheduling applicationsTurns a business planning problem into a model, solves it, and puts the plan in front of a planner.

Abstract. Turns a business planning problem into a model, solves it, and puts the plan in front of a planner.

Concrete. S&OP and supply planning in Kinaxis, SAP IBP or o9. Route planning in a TMS or a routing product. Nurse rostering. Lot dispatching in a fab. A food production schedule that respects changeovers and allergen order.

Value it creates
Better plans and faster replanning: less inventory, fewer miles, fewer changeovers, more throughput.
What it predicts or decides
What to make, when and where; which truck takes which stop; who works which shift.
Data it needs collected
Master data, demand, capacities, and the rules, many of which are only in the planner's head.
How often it acts
Daily or weekly plans, replanned within the day.
Usual tech stack and vendors
Vendor apps with an embedded solver; in-house Python plus a solver at large firms.
Who in the company it talks to
Supply chain director, head of planning, transport director. The daily user is the planner, who is often not the buyer.
Knowledge needed: tech vs vertical
Both, and deeply. The regional report's Chinese rule: 30% software, 70% implementation team.
How it is delivered: in-house, human labour, consulting, product
Product plus heavy implementation at large firms; Excel in the mid-market.
How standardisable
Medium. A common core per vertical, with the last part per customer.
How commoditised
Low to medium. Vendors differ by vertical fit, not by solver.
Profit margins of the sellers
Kinaxis 64.6% gross, 14.5% operating. Descartes 28.8% and Manhattan 25.9% operating, both with execution in the bundle. Blue Yonder reports 103.8% net revenue retention (trade press, from a company update): customers stay but expand slowly.
Edge and pricing leverage
Medium. The value is large but hard to attribute; the field report found savings counted without baselines and credited to the wrong layer (4.7).
Switching cost
Medium to high.
Money it moves
Descartes says one customer, ArrowXL, cut fleet mileage 13% (vendor claim). On nine historical datasets at a Seagate wafer fab, an optimising scheduler cut total cycle time about 9% and raised throughput 7% (Winter Simulation Conference 2020, partly vendor authors). An earlier Samsung project cut DRAM cycle time 18.5%, put at about $1bn extra revenue over five years.
Software vs hardware vs human expert
Software, implementation consultants, and the planner who must use it.
Cement vs precision vs food vs road
Cement: few products and continuous flow, so the planning value is in distribution and fuel and raw-material buying. Precision: re-entrant flow in fabs is among the hardest scheduling problems, and the most valuable. Food: changeovers, allergens, shelf life and variable raw material. Road: routing, the most productised OR problem.
8 Advanced process control and real-time optimisationOptimisation inside the control loop: adjusts setpoints every few seconds or minutes to keep a process at its best operating point.

Abstract. Optimisation inside the control loop: adjusts setpoints every few seconds or minutes to keep a process at its best operating point.

Concrete. An expert optimiser on a cement kiln trimming fuel and fan speed. Model predictive control on a mill, a dryer or an evaporator.

Value it creates
Energy, throughput and steady quality. It is the most invisible form of OR, because it is called control.
What it predicts or decides
Setpoints: fuel rate, feed rate, fan speed, mill load.
Data it needs collected
DCS tags, analysers, and lab quality results.
How often it acts
Seconds to minutes.
Usual tech stack and vendors
Model predictive control, rule-based expert systems, increasingly hybrid with ML. ABB, FLSmidth, Siemens, Honeywell, AspenTech, Yokogawa.
Who in the company it talks to
Plant manager, process engineer, the group's technical or energy and decarbonisation team.
Knowledge needed: tech vs vertical
Very deep process knowledge plus control theory.
How it is delivered: in-house, human labour, consulting, product
Product commissioned by the vendor's engineers on top of the existing DCS.
How standardisable
Medium. The product is standard; the model is tuned per plant.
How commoditised
Low.
Profit margins of the sellers
AspenTech 66.0% gross in its last public year, with an operating loss caused by acquisition amortisation. Emerson's Control Systems and Software unit, which now includes AspenTech, 33.0% adjusted EBITA.
Edge and pricing leverage
High. The saving shows up directly on the energy bill, and the product is tied to the control system.
Switching cost
High.
Money it moves
ABB reports kiln thermal energy down 3% and manual operator actions down about 70% at Tokuyama's Nanyo plant (vendor claim). AspenTech claims 2 to 5% throughput, 3% yield and 10% energy for its MPC product (vendor claim).
Software vs hardware vs human expert
Software and process engineers, running on hardware already installed.
Cement vs precision vs food vs road
Cement: core, because energy is the largest controllable cost. Precision: run-to-run control between process steps. Food: ovens, dryers and evaporators, less common. Road: no equivalent.
9 Simulation and digital twinLets you test a design or a plan before doing it for real.

Abstract. Lets you test a design or a plan before doing it for real.

Concrete. A model of a new warehouse to check throughput. A fab capacity model before buying tools. A process model of a new kiln line.

Value it creates
Fewer expensive mistakes, mainly in capital spending and policy changes. The regional report found it almost absent from the adoption evidence (4.4).
What it predicts or decides
Nothing directly. It supports decisions about capacity, layout and rules.
Data it needs collected
Layouts, process times, failure and demand distributions.
How often it acts
Project-based.
Usual tech stack and vendors
Engineering simulation from Ansys, Dassault, PTC; process simulation; operations simulation from AnyLogic, Siemens Plant Simulation, FlexSim.
Who in the company it talks to
Engineering, industrial engineering, capital project teams, and consultants.
Knowledge needed: tech vs vertical
Modelling skill plus the vertical.
How it is delivered: in-house, human labour, consulting, product
Tool product plus expert modellers, often one-off studies.
How standardisable
The tool is standard. Each model is bespoke.
How commoditised
Low.
Profit margins of the sellers
The highest gross margins in the stack: Ansys 89.0% gross, 28.2% operating (last public year); PTC 83.8% gross, 35.9% operating; Dassault about 83.7% gross, 21.7% operating. These are engineering-design tools; the operations-simulation vendors are private.
Edge and pricing leverage
High inside engineering workflows. Lower for operations studies, which are bought one at a time.
Switching cost
High for engineering, low for operations studies.
Money it moves
Capital avoided or better spent. No sourced figure.
Software vs hardware vs human expert
Software plus expert modellers.
Cement vs precision vs food vs road
Cement: process and plant design. Precision: fab capacity and tool purchases, where one tool is a large cheque. Food: line design. Road: depot and network design.
10 Integration and consultingPeople who connect the layers and make one company's problem fit a product.

Abstract. People who connect the layers and make one company's problem fit a product.

Concrete. A large integrator rolling out SAP. A boutique OR firm (ORTEC, DecisionBrain, Eurodécision in the field report) building a custom planner.

Value it creates
Fit, integration and change management. In OR it is usually where the project actually happens.
What it predicts or decides
Designs the decision process.
Data it needs collected
Whatever the project needs, often collected by hand.
How often it acts
Project-based.
Usual tech stack and vendors
Everything above.
Who in the company it talks to
CIO, COO, sometimes the board.
Knowledge needed: tech vs vertical
Both, held in people rather than products.
How it is delivered: in-house, human labour, consulting, product
Consulting.
How standardisable
Low.
How commoditised
Priced by labour.
Profit margins of the sellers
Accenture about 32% gross, 15.4% operating; Capgemini 13.3% operating margin. This is the labour-priced layer.
Edge and pricing leverage
Low per hour, high per relationship.
Switching cost
The relationship, and the fact that nobody else understands the custom model.
Money it moves
Revenue scales with headcount; the field report quotes a Chinese solver company whose project business "scales with headcount" (section 5).
Software vs hardware vs human expert
Human experts.
Cement vs precision vs food vs road
Same pattern everywhere. A custom model often dies when its author leaves.
11 The human plannerThe person who makes the decision today, in their head or in Excel, and quietly absorbs every gap between plan and reality.

Abstract. The person who makes the decision today, in their head or in Excel, and quietly absorbs every gap between plan and reality.

Concrete. The dispatcher, the shift scheduler, the kiln operator, the production planner.

Value it creates
Tacit rules, flexibility, and accountability. The field report names this as the one cause behind all three stalls.
What it predicts or decides
Everything that is not automated, and overrides most of what is.
Data it needs collected
In their head: which customer is difficult, which machine runs slow, which driver knows which street.
How often it acts
All the time.
Usual tech stack and vendors
Excel, phone, WhatsApp, ERP screens.
Who in the company it talks to
Not bought, hired.
Knowledge needed: tech vs vertical
Deep vertical, no OR.
How it is delivered: in-house, human labour, consulting, product
In-house labour.
How standardisable
None.
How commoditised
Scarce: 53% of German logistics firms lack dispatchers (Bitkom 2026, in the regional report).
Profit margins of the sellers
Not a seller; a cost line.
Edge and pricing leverage
Very high. The planner is the incumbent every OR product competes with, and the one who decides whether it is used.
Switching cost
Highest of all: the knowledge leaves when the person does.
Money it moves
The field report: 81% of S&OP still runs in Excel.
Software vs hardware vs human expert
Human.
Cement vs precision vs food vs road
Cement: the kiln operator is replaced step by step by APC. Precision: industrial engineers and dispatch rules. Food: the planner who knows the allergen order. Road: the dispatcher, the scarcest of all.

3 · One dimension across all layers

The same content as section 2, turned sideways: pick a dimension to read it down the stack.

LayerValue it creates
1 · SensingVisibility, and the back-channel that tells a plan what actually happened. The regional report found this missing almost everywhere: in DACH only 44% capture machine feedback (matrix 2).
2 · ControlExecution and traceability. It is the control interface, and the robots piece in the field report argues that the optimisation layer ends up owned by whoever owns this layer (field report, tab 3).
3 · ERPOne record that everyone plans from. It is the main input to planning and the main source of the data problem.
4 · DataIntegration. The regional report calls data "the first stall, in every language"; this layer is where that stall is fought (stage 3).
5 · PredictionLess uncertainty. It is advisory: the human still decides, which is why it is easier to adopt (tab 1, section 4).
6 · SolverThe mathematical engine, with a certificate. The field report's central finding is that this is never where projects fail: it is the commodity layer.
7 · Planning appBetter plans and faster replanning: less inventory, fewer miles, fewer changeovers, more throughput.
8 · APCEnergy, throughput and steady quality. It is the most invisible form of OR, because it is called control.
9 · SimulationFewer expensive mistakes, mainly in capital spending and policy changes. The regional report found it almost absent from the adoption evidence (4.4).
10 · ConsultingFit, integration and change management. In OR it is usually where the project actually happens.
11 · HumanTacit rules, flexibility, and accountability. The field report names this as the one cause behind all three stalls.
LayerWhat it predicts or decides
1 · SensingMostly nothing. Machine vision is the exception: it rejects a part, which is the first automated decision in the stack.
2 · ControlLow-level control loops and sequences. WMS slotting and pick order. A TMS often embeds simple routing.
3 · ERPRule-based MRP, not optimisation. Optimisers are embedded in its planning modules: Gurobi has been inside SAP supply chain products since 2015.
4 · DataNothing.
5 · PredictionPredicts. On its own it decides nothing; it supplies inputs to a decision.
6 · SolverComputes the decision another layer asked for.
7 · Planning appWhat to make, when and where; which truck takes which stop; who works which shift.
8 · APCSetpoints: fuel rate, feed rate, fan speed, mill load.
9 · SimulationNothing directly. It supports decisions about capacity, layout and rules.
10 · ConsultingDesigns the decision process.
11 · HumanEverything that is not automated, and overrides most of what is.
LayerData it needs collected
1 · SensingRaw signals: temperature, pressure, flow, composition, images, position, weight.
2 · ControlSetpoints and states, lot genealogy, order status, proof of delivery.
3 · ERPOrders, bills of material, routings, prices, stock, customer and supplier master data.
4 · DataEverything below it, as time series joined to master data.
5 · PredictionHistory with outcomes: lab results, failures, sales, defects, arrival times.
6 · SolverNone of its own: a model and its parameters.
7 · Planning appMaster data, demand, capacities, and the rules, many of which are only in the planner's head.
8 · APCDCS tags, analysers, and lab quality results.
9 · SimulationLayouts, process times, failure and demand distributions.
10 · ConsultingWhatever the project needs, often collected by hand.
11 · HumanIn their head: which customer is difficult, which machine runs slow, which driver knows which street.
LayerHow often it acts
1 · SensingContinuous.
2 · ControlMilliseconds (control loops) to minutes (dispatch).
3 · ERPTransactional; planning runs nightly.
4 · DataContinuous ingestion; batch joins.
5 · PredictionDaily forecasts to real-time estimates.
6 · SolverPer solve, seconds to hours.
7 · Planning appDaily or weekly plans, replanned within the day.
8 · APCSeconds to minutes.
9 · SimulationProject-based.
10 · ConsultingProject-based.
11 · HumanAll the time.
LayerUsual tech stack and vendors
1 · SensingField instruments and analysers (Endress+Hauser, SICK), vision (Cognex, Keyence), fieldbus and OPC UA gateways, telematics (Samsara and others).
2 · ControlDCS and PLC from Siemens, Rockwell, ABB, Emerson, Honeywell, Yokogawa. MES. WMS from Manhattan, Blue Yonder, SAP. TMS from Descartes, Oracle, SAP.
3 · ERPSAP, Oracle, Microsoft Dynamics, Infor, and regional players.
4 · DataAVEVA PI and other historians on the plant side. Snowflake, Databricks, the hyperscaler clouds, Palantir Foundry, ETL tools on the IT side.
5 · PredictionPower BI, Tableau; Python with scikit-learn, XGBoost, PyTorch; SageMaker, Vertex AI, Azure ML, Databricks; vertical vendors for process plants.
6 · SolverCommercial: Gurobi, FICO Xpress, IBM CPLEX, Hexaly, COPT. Open: OR-Tools, HiGHS, SCIP, cuOpt. Modelling: Pyomo, JuMP, AMPL, GAMS.
7 · Planning appVendor apps with an embedded solver; in-house Python plus a solver at large firms.
8 · APCModel predictive control, rule-based expert systems, increasingly hybrid with ML. ABB, FLSmidth, Siemens, Honeywell, AspenTech, Yokogawa.
9 · SimulationEngineering simulation from Ansys, Dassault, PTC; process simulation; operations simulation from AnyLogic, Siemens Plant Simulation, FlexSim.
10 · ConsultingEverything above.
11 · HumanExcel, phone, WhatsApp, ERP screens.
LayerWho in the company it talks to
1 · SensingPlant engineering, maintenance, quality. For telematics, the fleet or transport manager.
2 · ControlPlant manager, automation engineer, operations or logistics director, with IT.
3 · ERPCFO and CIO.
4 · DataCIO, chief data officer, data team. The historian is bought by plant engineering.
5 · PredictionData science or BI team, and function heads: demand planning, quality, maintenance.
6 · SolverOR teams and software vendors that embed it. Almost never the business.
7 · Planning appSupply chain director, head of planning, transport director. The daily user is the planner, who is often not the buyer.
8 · APCPlant manager, process engineer, the group's technical or energy and decarbonisation team.
9 · SimulationEngineering, industrial engineering, capital project teams, and consultants.
10 · ConsultingCIO, COO, sometimes the board.
11 · HumanNot bought, hired.
LayerKnowledge needed: tech vs vertical
1 · SensingPhysics of the process and of the instrument. Very vertical: an analyser for clinker is not one for milk.
2 · ControlStrongly vertical and safety-critical. Controls engineering for the plant side, warehouse and transport process for the logistics side.
3 · ERPBusiness process and accounting. Moderately vertical.
4 · DataMostly technical. Vertical knowledge is needed for the meaning of the data, which is the hard part.
5 · PredictionThe technical skill is widely available (tab 1). Vertical knowledge decides which prediction is worth making.
6 · SolverDeep mathematics. No vertical knowledge.
7 · Planning appBoth, and deeply. The regional report's Chinese rule: 30% software, 70% implementation team.
8 · APCVery deep process knowledge plus control theory.
9 · SimulationModelling skill plus the vertical.
10 · ConsultingBoth, held in people rather than products.
11 · HumanDeep vertical, no OR.
LayerHow it is delivered: in-house, human labour, consulting, product
1 · SensingProduct, installed by the vendor's service teams or an integrator.
2 · ControlProduct with heavy implementation. At Manhattan, services are 46.5% of revenue.
3 · ERPProduct, implemented by system integrators.
4 · DataProduct, run by an internal data team, often set up by an integrator.
5 · PredictionMostly in-house or as a feature of a platform. Consulting for setup.
6 · SolverProduct (licence), most often sold to another software company to embed.
7 · Planning appProduct plus heavy implementation at large firms; Excel in the mid-market.
8 · APCProduct commissioned by the vendor's engineers on top of the existing DCS.
9 · SimulationTool product plus expert modellers, often one-off studies.
10 · ConsultingConsulting.
11 · HumanIn-house labour.
LayerHow standardisable
1 · SensingHigh for the device and the interface. Low for where to put it and what to measure.
2 · ControlThe product is standard. Configuration is per site.
3 · ERPHigh at the core, custom at the edges.
4 · DataTechnically high. The semantics (what this tag or field means) are not.
5 · PredictionThe method is highly standard. Features and data cleaning are per site.
6 · SolverFully standard.
7 · Planning appMedium. A common core per vertical, with the last part per customer.
8 · APCMedium. The product is standard; the model is tuned per plant.
9 · SimulationThe tool is standard. Each model is bespoke.
10 · ConsultingLow.
11 · HumanNone.
LayerHow commoditised
1 · SensingBasic sensors are commodities. Analysers, vision and certified instruments are not.
2 · ControlLow for DCS and MES. WMS and TMS are more competitive.
3 · ERPLow.
4 · DataStorage and compute are commodities. A contextualised plant data model is not.
5 · PredictionHigh: open-source libraries and pretrained models.
6 · SolverRising: HiGHS is open, and NVIDIA publishes cuOpt under Apache 2.0.
7 · Planning appLow to medium. Vendors differ by vertical fit, not by solver.
8 · APCLow.
9 · SimulationLow.
10 · ConsultingPriced by labour.
11 · HumanScarce: 53% of German logistics firms lack dispatchers (Bitkom 2026, in the regional report).
LayerProfit margins of the sellers
1 · SensingThe widest spread in the stack. Keyence 51.0% operating margin, SICK 3.0% EBIT, Endress+Hauser 11.9%, Cognex 16.3% on 66.9% gross. Samsara, sold as subscription, 77% gross and -3% operating.
2 · ControlInside the automation majors this is where margin sits. Rockwell Software and Control 29.7% segment margin vs 18.0% devices and 14.5% lifecycle services. Emerson Control Systems and Software 33.0% adjusted EBITA. Siemens Digital Industries 14.9%. Manhattan 25.9% GAAP operating, Descartes 28.8% on 77% gross.
3 · ERPSAP 73.2% gross, 26.7% operating, services only 11.6% of revenue. Oracle 31% operating.
4 · DataSnowflake 67% gross, -31% GAAP operating. Palantir 82.4% gross, 31.6% operating. AVEVA 81.2% gross, 29.5% adjusted EBIT (last public year, to March 2022).
5 · PredictionHorizontal tools struggle to keep the value. C3.ai 31% gross with an operating loss about twice its revenue. Alteryx 86.5% gross, -17.0% operating in its last public year.
6 · SolverNo one discloses pure solver revenue. Gurobi is private and reports over 1,200 customers through its owner. FICO is the useful contrast: its Scores segment earns 87.8% segment margin, its Software segment 30.1%, selling to the same banks.
7 · Planning appKinaxis 64.6% gross, 14.5% operating. Descartes 28.8% and Manhattan 25.9% operating, both with execution in the bundle. Blue Yonder reports 103.8% net revenue retention (trade press, from a company update): customers stay but expand slowly.
8 · APCAspenTech 66.0% gross in its last public year, with an operating loss caused by acquisition amortisation. Emerson's Control Systems and Software unit, which now includes AspenTech, 33.0% adjusted EBITA.
9 · SimulationThe highest gross margins in the stack: Ansys 89.0% gross, 28.2% operating (last public year); PTC 83.8% gross, 35.9% operating; Dassault about 83.7% gross, 21.7% operating. These are engineering-design tools; the operations-simulation vendors are private.
10 · ConsultingAccenture about 32% gross, 15.4% operating; Capgemini 13.3% operating margin. This is the labour-priced layer.
11 · HumanNot a seller; a cost line.
LayerEdge and pricing leverage
1 · SensingDepends on the business model, not the layer: a catalogue product sold direct (Keyence) earns software-like margins, an engineering-heavy one does not.
2 · ControlHigh. It owns the switch. Replacing a DCS means stopping the plant.
3 · ERPVery high. SAP is moving licences to cloud with no loss of gross margin (cloud gross margin 74.2%), which is what lock-in looks like.
4 · DataHigh through consumption: net revenue retention 125% at Snowflake and above 140% at Databricks, so customers keep spending more.
5 · PredictionLow as a horizontal tool. Higher when it is sold together with the decision it feeds, for example closed-loop kiln control priced on fuel saved.
6 · SolverHigh for performance-critical users, falling for basic solving. The FICO split says the money is in becoming a standard inside a process, not in the algorithm.
7 · Planning appMedium. The value is large but hard to attribute; the field report found savings counted without baselines and credited to the wrong layer (4.7).
8 · APCHigh. The saving shows up directly on the energy bill, and the product is tied to the control system.
9 · SimulationHigh inside engineering workflows. Lower for operations studies, which are bought one at a time.
10 · ConsultingLow per hour, high per relationship.
11 · HumanVery high. The planner is the incumbent every OR product competes with, and the one who decides whether it is used.
LayerSwitching cost
1 · SensingMedium. An instrument lives as long as the line it sits on.
2 · ControlVery high.
3 · ERPVery high.
4 · DataHigh.
5 · PredictionLow.
6 · SolverMedium: models written against one vendor's interface.
7 · Planning appMedium to high.
8 · APCHigh.
9 · SimulationHigh for engineering, low for operations studies.
10 · ConsultingThe relationship, and the fact that nobody else understands the custom model.
11 · HumanHighest of all: the knowledge leaves when the person does.
LayerMoney it moves
1 · SensingEnabler. Its value is counted in the layers above, and its absence is where OR projects stall first.
2 · ControlHard to isolate, because it is the precondition for everything above.
3 · ERPIndirect. Bad master data here is what makes optimisation above it fail.
4 · DataIndirect, and the spend grows with use.
5 · PredictionOnly as much as the decision it feeds. One process-AI vendor (Imubit) says lab free-lime results describe the kiln 30 minutes to hours late, and that closing the loop cut process variability by 20 to 30% (vendor claim).
6 · SolverThe smallest pool relative to the value it enables, because the value is booked in the layers above.
7 · Planning appDescartes says one customer, ArrowXL, cut fleet mileage 13% (vendor claim). On nine historical datasets at a Seagate wafer fab, an optimising scheduler cut total cycle time about 9% and raised throughput 7% (Winter Simulation Conference 2020, partly vendor authors). An earlier Samsung project cut DRAM cycle time 18.5%, put at about $1bn extra revenue over five years.
8 · APCABB reports kiln thermal energy down 3% and manual operator actions down about 70% at Tokuyama's Nanyo plant (vendor claim). AspenTech claims 2 to 5% throughput, 3% yield and 10% energy for its MPC product (vendor claim).
9 · SimulationCapital avoided or better spent. No sourced figure.
10 · ConsultingRevenue scales with headcount; the field report quotes a Chinese solver company whose project business "scales with headcount" (section 5).
11 · HumanThe field report: 81% of S&OP still runs in Excel.
LayerSoftware vs hardware vs human expert
1 · SensingMostly hardware plus installation labour. Telematics shows the move to subscription software.
2 · ControlSoftware and controller hardware, plus engineering labour.
3 · ERPSoftware plus a large integrator workforce.
4 · DataSoftware and cloud compute plus data engineers.
5 · PredictionSoftware and data scientists.
6 · SolverPure software. Increasingly GPU compute.
7 · Planning appSoftware, implementation consultants, and the planner who must use it.
8 · APCSoftware and process engineers, running on hardware already installed.
9 · SimulationSoftware plus expert modellers.
10 · ConsultingHuman experts.
11 · HumanHuman.
LayerCement vs precision vs food vs road
1 · SensingCement: few expensive analysers in a harsh environment, and lab results arrive hours late. Precision: extreme density, fabs now sample every tens of milliseconds and collect hundreds of petabytes a year. Food: many cheap washdown-rated sensors, much still recorded on paper. Road: a telematics box per vehicle, and drivers who do not switch on the app.
2 · ControlCement: a DCS with cement-specific libraries from a handful of vendors. Precision: the MES record is part of the regulated quality record. Food: traceability is law; the US FSMA 204 rule requires records of 7 critical tracking events, handed to FDA within 24 hours, enforced from 2028-07-20. Road: the TMS and the driver app.
3 · ERPCement: few products, co-products and recipes. Precision: configurations and serial numbers. Food: batches, expiry dates, variable weights. Road: orders and addresses, often the weakest master data of all.
4 · DataCement and process: a long historian culture, data exists but lab data lags. Precision: volume is the problem. Food: much of the floor is paper and spreadsheets. Road: telematics data exists, but service times and real addresses are not recorded.
5 · PredictionCement: soft sensors where the lab is slow. Precision: the biggest single number on this page; an Entegris executive put 1% of yield at about $500m a year of profit at an advanced logic fab, $150m at a memory fab. Food: forecasting against waste, which is 3.8% of food handled in UK manufacturing (WRAP). Road: arrival-time and service-time prediction.
6 · SolverSame engine everywhere, different problem classes: blending and recipes (linear programmes) in cement and food, scheduling (mixed integer and constraint programming) in precision and food, vehicle routing in road.
7 · Planning appCement: few products and continuous flow, so the planning value is in distribution and fuel and raw-material buying. Precision: re-entrant flow in fabs is among the hardest scheduling problems, and the most valuable. Food: changeovers, allergens, shelf life and variable raw material. Road: routing, the most productised OR problem.
8 · APCCement: core, because energy is the largest controllable cost. Precision: run-to-run control between process steps. Food: ovens, dryers and evaporators, less common. Road: no equivalent.
9 · SimulationCement: process and plant design. Precision: fab capacity and tool purchases, where one tool is a large cheque. Food: line design. Road: depot and network design.
10 · ConsultingSame pattern everywhere. A custom model often dies when its author leaves.
11 · HumanCement: the kiln operator is replaced step by step by APC. Precision: industrial engineers and dispatch rules. Food: the planner who knows the allergen order. Road: the dispatcher, the scarcest of all.

4 · Cement vs precision vs food vs road

It differs a lot, and mostly in what the money is made of. Four reference columns: bulk continuous process (cement), high-precision discrete manufacturing (semiconductors, medtech, aerospace), food and beverage, and road logistics as the reference case.

CementPrecision manufacturingFood and beverageRoad logistics
Cost structureEnergy is 20 to 40% of production cost (US EPA ENERGY STAR guide). A kiln uses 3.6 GJ per tonne of clinker (IEA, 2022).Dominated by capital and yield. Fabs collect hundreds of petabytes a year.Raw material dominates. UK manufacturers waste 3.8% of the food they handle (WRAP). US manufacturing surplus food is worth $42.7bn, about 7% of manufacturing sales (ReFED, 2024).US trucking costs $2.336 a mile: driver wages and benefits $1.03, fuel $0.48 (ATRI, 2025).
Producer marginsHeidelberg Materials 21.8% operating EBITDA; Holcim 18.3% recurring EBIT (2025).ASML 34.6% operating (an equipment maker); Jabil 5.4% core operating (a contract manufacturer).Nestlé 16.1% underlying operating; Tyson 2.0% GAAP operating; Arla about 2.75% net (2025).US truckload 0.4%, less-than-truckload 11.6% operating (ATRI). DSV Road about 4.8%, Kuehne+Nagel Road about 2.8% (2024).
What the money is made ofEnergy and carbon. EU carbon allowances averaged about 74 euros a tonne in 2025 (LSEG), and Heidelberg emits 512 kg net CO2 per tonne of cementitious material.Yield and cycle time, which means capital utilisation. 1% of yield is about $500m a year of profit at an advanced logic fab, said an Entegris executive in October 2025.Raw material yield, waste and changeover capacity. The Danish Meat Research Institute reports EUR 0.02 to 0.05 more profit per carcass kg from its yield projects (its own brochure).Driver hours and fuel.
Which layers carry the valueAPC on kiln and mills, raw mix and fuel mix optimisation, then distribution.Prediction (yield, virtual metrology, inspection) and fab scheduling. The most ML-heavy and the most valuable OR scheduling.Forecasting for perishables, production scheduling, cutting and yield optimisation, shelf-life-aware stock rotation.Routing and dispatch, the most productised OR problem.
Where ML vs OR paysOR first: the physics is known, so optimising control beats predicting. ML mostly as soft sensors feeding the optimiser.Both, heavily. ML for yield; OR for scheduling.Both, but the mid-market runs on Excel.OR for routes, ML for arrival and service times.
DataDCS tags, analysers, lab results that arrive late.Very high volume: tool sensors sampled every tens of milliseconds, metrology, images.Batches, expiry dates, checkweighers, much paper on the floor.Telematics plus orders and addresses that are often wrong.
Who decidesPlant manager, process engineer, group decarbonisation.Yield engineering, fab operations, industrial engineering.Plant manager, planner, quality, supply chain director.Transport or operations director; the dispatcher in practice.
CadenceSeconds (control), shift (quality), weekly (fuel and raw mix).Seconds to minutes (dispatching), per lot (yield).Shift and daily.Daily routes, minutes for re-routing.
Regulation that shapes itEU emissions trading, with free allowances phasing out.Regulated quality records in medtech and aerospace.Traceability law: EU one-step-back-one-step-forward; US FSMA 204 enforced from 2028-07-20.Driving-time rules; labour shortage is the stronger pull.
Claude's arithmetic from the numbers above

Where 1% moves the most money relative to margin. Road first: 1% fewer miles saves at least 0.2% of cost in fuel alone, more where drivers are paid by the mile, against truckload margins under 1%. Then low-margin food: cutting waste by one point of sales is a third or more of the net profit of a 3% producer. Then cement: with energy about 30% of cost and EBITDA about 20% of sales, 1% of fuel is roughly 1% of EBITDA, and carbon makes it more. Precision last relative to its high margins, but first in absolute money per site.

That ordering also predicts the selling motion. Where margins are thin (road, food) the buyer is desperate but cannot pay much, so products must be cheap and standard. Where money per site is huge (fabs, cement plants) the buyer pays for bespoke engineering, so consulting-heavy delivery survives. The mid-market in thin-margin verticals is the hardest place to sell OR and the place it is most needed.

5 · Dimensions not on the original list that matter

Claude's opinion, not a dataset
DimensionWhy it matters for getting a feel
Who owns the control interfaceThe layer that can actually press the button (DCS, WMS, TMS, the robot fleet) ends up owning the optimisation above it. APC belongs to the DCS vendors for this reason, and the robots piece in the field report makes the same argument for automated sites.
Who gets credit for the savingA prediction rarely gets credit; an optimiser often gets credit for the wrong thing. The field report found mileage control counted as routing savings. Layers that cannot prove their value get priced as cost.
Who carries the blameA wrong forecast is a bad number; a wrong plan stops a line or strands a truck. The higher the cost of a wrong decision, the slower adoption, the higher the price, and the more the human keeps an override.
Is the user the buyer?The supply chain director buys and the planner uses. When the user is not the buyer, adoption fails at daily use even after a successful sale. This is the "stage 5" stall in the regional report.
How fast the decision must be takenSeconds (APC, dispatching) forces automation and wins; weeks (S&OP) leaves room for a human to redo it in Excel.
How much of the problem is the same across customersThis decides product vs consulting more than any other factor. Routing and rostering are similar enough to productise; a cement group's network or a fab's dispatch rules are not.
How variable the raw material isFood and cement work with natural raw material that varies every batch; precision works to a specification. Variable inputs need prediction feeding the optimiser.
Recurring or one-off revenueSimulation studies and consulting projects are one-off; control software and ERP are recurring. Net revenue retention, where published (Snowflake 125%, Blue Yonder 103.8%), shows how much a layer grows inside a customer.
Age of the installed baseA brownfield plant with a 20-year-old control system needs integration before optimisation. Greenfield sites, and robotised ones, start with the control interface already digital.
Regulation as pull or as brakeCarbon price, traceability law and staffing mandates pull; works councils and data protection brake opaque decisions. The field report found regulation and labour shortage were the only pulls that moved buyers.
Labour substitution or augmentationWhere the planner is scarce (dispatchers in Germany), automation is welcomed. Where the planner is secure, the tool is a threat and gets overridden.

6 · What the map says about where OR can make money

Claude's opinion, not a dataset
  1. Do not sell the solver. It is the commodity layer, it is under open-source pressure from HiGHS and cuOpt, and nobody discloses solver revenue because the pool is small. Gurobi's real business is being embedded in SAP and others.
  2. Sell the decision where it is bound to a control interface or a record. APC (bound to the DCS), routing in a TMS (bound to dispatch), and planning inside ERP are the three places OR already earns software margins. A standalone planning app earns less (Kinaxis 14.5% operating) because it has to win the planner every day.
  3. Become a standard, the FICO way. The 88% vs 30% split is the lesson: a shared measure or interface that a whole industry depends on is worth more than better software. In OR that could be a standard data contract per vertical, the neutral layer argued for in tab 1, section 6.
  4. Pick the vertical by what the money is made of. Energy-bound processes (cement, chemicals) buy optimisation that saves energy and carbon, and pay for engineering. Thin-margin verticals (road, food mid-market) need cheap standard products, and labour shortage is what opens the door.
  5. Price on the saving where the saving can be measured. APC can be measured on the energy bill. Planning savings cannot without a baseline, so in planning the first product feature is the baseline, which is the evaluator gap the field report keeps finding.

7 · Sources for this tab

Retrieved 2026-11-03 and 2026-11-04. Margins computed from the lines of a filing are marked "about" in the text. Vendor claims are labelled where used.

Company filings and releases

  • Keyence FY to March 2026 results; Cognex FY2025 Q4 release; SICK FY2025 press release; Endress+Hauser FY2025 press release; Samsara FY2026 Q4 release (SEC).
  • Rockwell Automation FY2025 (SEC exhibit 99); Siemens Q4 FY2025 release; Emerson FY2025 Q4 release (SEC); Manhattan Associates FY2025 (SEC); Descartes FY2026 (SEC); Descartes ArrowXL release, 2026-08-11 (vendor claim).
  • SAP FY2025 (SEC 6-K exhibit); Oracle FY2026 annual results.
  • Snowflake FY2026 (SEC); Databricks release, 2026-02-09; AVEVA annual accounts to March 2022; Palantir FY2025 (SEC).
  • C3.ai FY2026 (SEC); Alteryx FY2023 (SEC).
  • FICO FY2025 segment note and Q4 release (SEC); Thompson Street Capital release on Gurobi, 2024-09-18; Hexaly pricing page; NVIDIA cuOpt getting-started page.
  • Kinaxis FY2025 results; AspenTech 10-K for FY to June 2024; Blue Yonder FY25 update as reported by ChannelLife; AspenTech DMC3 product page (vendor claim).
  • Dassault Systèmes FY2025 release; PTC FY2025 results; Ansys FY2024 (SEC).
  • Accenture FY2026 (SEC 8-K exhibit); Capgemini FY2025 results.
  • Heidelberg Materials Business Figures 2025; Holcim FY2025 release, 2026-02-27; ASML FY2025 (SEC 6-K); Jabil FY2025 (SEC 8-K); Nestlé FY2025 release, 2026-02-19; Arla 2025 as reported by Co-op News, 2026-02-18; Tyson FY2025 release, 2025-11-10.

Vertical sources

  • US EPA ENERGY STAR Guide for the Cement Industry (LBNL authors, 2013): energy 20 to 40% of production cost. IEA Cement tracking report: 3.6 GJ per tonne clinker, 2022.
  • LSEG Q1 2026 EUA price update: 2025 average 74.40 euros a tonne.
  • World Cement, 2023-08-24, on ABB Expert Optimizer at Tokuyama Nanyo (vendor claim). Imubit article on free-lime prediction (vendor claim).
  • James O'Neill, Entegris CTO, Yale talk 2025-10-28, via a quote aggregator. Semiconductor Engineering, 2026-10-08, on fab data volumes.
  • Winter Simulation Conference 2020 paper on Flexciton and Seagate Springtown, citing Leachman et al. 2002 on Samsung DRAM cycle time.
  • WRAP Food Waste and Food Surplus Key Facts, July 2025. ReFED manufacturing fact sheet, 2025. FDA FSMA 204 rule page. Danish Meat Research Institute pork profit brochure.
  • ATRI operational costs of trucking 2025, via Transport Topics, 2026-07-17. Freight Perspectives, 2025-06-02, on European road margins.

Looked for and did not find

  • Revenue or margin for any pure solver company, and for o9, AnyLogic, ORTEC and DataRobot.
  • Typical sales-cycle length and contract size per layer.
  • An independent cost split for cement beyond the energy share, independent kiln predictive-maintenance savings, and an independent food fill-giveaway rate.
  • A published fab margin and the cost of a scrapped aerospace or medtech part.